Diving Services for Underwater Spool Metrology

  • Owner: Iranian Offshore Oil Company
  • Contract: C
  • Location: Soroush and Nourooz Oil Filed
  • Client: Maroon Sazeh
  • Year: 2009
  • Duration: 1 Month
During this project Persian Offshore assisted client in underwater metrology of spool pieces and dummy spool pieces at Soroush and Nowrooz oil fields using LBL/USBL equipments.

Kharg Island west and east quays Inspection and NDT

  • Owner: Iranian Oil Terminals Company
  • Contract: C
  • Location: Kharg Island
  • Client: Iranian Oil Terminals Company
  • Year: 2009
  • Duration: 9 Months

Project scope consists of Visual Inspection, Video Recording, Thickness Measurement and Cathode Protection Measurement of East and West quays of Kharg Island for Iranian Oil Terminals Company.

SPM and Subsea Pipeline Repair and Maintenance at Persian Gulf

  • Owner: Iranian Oil Terminals Company
  • Contract: C
  • Location: Kharg and Assalouyeh
  • Client: Iranian Oil Terminals Company
  • Year: 2009
  • Duration: One Year

Project scope consists of emergency repairs on the Kharg-Genaveh subsea pipelines and also emergency repairs and maintenance on the Assaluyeh SPM number one and number two at Persian Gulf area for duration of one year.

South Pars Integrated Fiber Optic Network

  • Owner: Petro Pars
  • Contract: Procurement and Construction
  • Location: South Pars Gas Field
  • Client: Transtel Engineering
  • Year: 2007
  • Duration: 2 Month
Cooperation with Transtel as Subcontractor. Project was includes supply and Installation of 5 Explosion Proof split Air Condition units for SPQ1 platform. Installation of indoor and outdoor units, cabling and piping was carried out by Persian Offshore technicians.

South Pars Integrated Fiber Optic Network

  • Owner: Petro Pars
  • Contract: Construction
  • Location: South Pars Gas Field
  • Client: Transtel Engineering
  • Year: 2008
  • Duration: 12 Months

Supply of several marine Spread including supply boats, tug boats and marine crew boats for forwarding the cargo, operation support and crew operations at South Pars Field and Assaluyeh Port. Also project scope included providing technical manpower for installation of cable ducting system and fiber optic cabling at South Pars Platforms.